Intended Use
WAGO Device Manager is a software solution for creating a project, configuring and parameterizing WAGO products.
Software operation is only permitted if the system requirements and license conditions are met.
The software creates project files. The project files are unencrypted. The project files can only be used in a secure operating environment that meets the following minimum requirements:
- Protected network segment
- Authorized access
- Secure Storage
Improper Use
Improper use of the software is not permitted. Specifically, improper use occurs in the following cases:
- Non-observance of the intended use
- Use of the software in areas with special risk that require continuous fault-free operation and in which failure of or operation of the software can result in an imminent risk to life, limb or health or cause serious damage to property or the environment (such as the operation of nuclear power plants, weapons systems, aircraft and motor vehicles)
Warranty and Liability
The provisions of the latest WAGO General Terms and Conditions of Deliveries and Services (GTC) apply as well as the Software License Terms for Standard Software (SW-License) applicable to software products und software embedded in WAGO hardware products, both available at: www.wago.com.
In particular, the warranty is void if:
- The software is improperly used.
- The deficiency (hardware and software configurations) is due to special instructions.
- Modifications to the hardware or software have been made by the user or third parties that are not described in this documentation and that has contributed to the fault.
Individual agreements always have priority.
Obligations of Installers/Operators
The installers and operators bear responsibility for the safety of an installation or a system assembled with the software. The installer/operator is responsible for proper construction and safety of the installation. All laws, standards, guidelines, local regulations and accepted technology standards and practices applicable at the time of installation, and the instructions in the the products’ Instructions for Use, must be complied with. In addition, the installment requirements for licensing must be observed. In the event of non-compliance, the products may not be operated within the scope of the approval.